I would like to reuse a number of steps from one recording to another and I was thinking of selecting the steps and doing copy and paste but that doesn't seem to be working. Is there a way to do it?
Ideally it would be great to be able to do a "Custom" command to let's say clear a text box. For example:
1. Play: <Ctrl-rightArrow><Shift><Ctrl-leftArrow><Backspace>
2. Validate the control is blank
How to copy steps from one recording to another?
- Support Team
- Site Admin
- Posts: 12145
- Joined: Fri Jul 07, 2006 4:30 pm
- Location: Houston, Texas, USA
- Contact:
- Support Team
- Site Admin
- Posts: 12145
- Joined: Fri Jul 07, 2006 4:30 pm
- Location: Houston, Texas, USA
- Contact:
Hi,
We've analyzed DevComponents controls and the ability to automate them with Ranorex. Generally, Ranorex is able to automate all DevComponents controls.
But in cases of context menus Ranorex Recorder does not support to recognize all items out of box. In such cases you'll have to track and prepare all required items (RanoreXPath) for automation manually with Ranorex Spy or directly within the recordings repository browser.
kind regards,
Christoph,
Ranorex Support Team
We've analyzed DevComponents controls and the ability to automate them with Ranorex. Generally, Ranorex is able to automate all DevComponents controls.
But in cases of context menus Ranorex Recorder does not support to recognize all items out of box. In such cases you'll have to track and prepare all required items (RanoreXPath) for automation manually with Ranorex Spy or directly within the recordings repository browser.
kind regards,
Christoph,
Ranorex Support Team
Re: How to copy steps from one recording to another?
Hello, just to inform myself, it is not possible to copy/paste a step from a recording as in TestComplete?
I clicked the button "User Code" in the upper right and in Recording1.cs I could copy paste a step,
but the Recording1.rxrec was not updated with the new additional step.
When I reopened the .cs the step was removed by Ranorex.
I am not trying to copy steps from Recording1 to Recording2, I am talking about only one recording.
Thanks for your help.
I clicked the button "User Code" in the upper right and in Recording1.cs I could copy paste a step,
but the Recording1.rxrec was not updated with the new additional step.
When I reopened the .cs the step was removed by Ranorex.
I am not trying to copy steps from Recording1 to Recording2, I am talking about only one recording.
Thanks for your help.
- Support Team
- Site Admin
- Posts: 12145
- Joined: Fri Jul 07, 2006 4:30 pm
- Location: Houston, Texas, USA
- Contact:
Re: How to copy steps from one recording to another?
Hi
When you change some code in the Recording.cs, this modifications will be overwritten when you compile or save your Project. Please see the header of the file
This file was automatically generated by RANOREX. DO NO MODIFY THIS FILE! It is generated by the designer. All your modifications will be lost!
Take a look to the user guide about User Code Items.
http://www.ranorex.com/support/user-gui ... tions.html
Regards,
Peter
Ranorex Support Team
Sorry but it's not possible to copy steps in a recording. But it's already on our feature list.CreeTar wrote:Hello, just to inform myself, it is not possible to copy/paste a step from a recording as in TestComplete?
When you change some code in the Recording.cs, this modifications will be overwritten when you compile or save your Project. Please see the header of the file
This file was automatically generated by RANOREX. DO NO MODIFY THIS FILE! It is generated by the designer. All your modifications will be lost!
Take a look to the user guide about User Code Items.
http://www.ranorex.com/support/user-gui ... tions.html
Regards,
Peter
Ranorex Support Team