Hi all,

I need to conduct a mass test with a couple thousand test cases. Naturally, the report would be huge and its performance would be rather bad. Additionally, functions inside the report such as "Collapse all" would not be available.

Someone had a similar problem but I couldn't quite find the answer:
https://ranorex.com/forum/split-report-files-t6889.html

Now, my question is, is there a way that I can start the test suite and it generates multiple reports with eg. 50 tests per report?

Thanks in advance
Fabio

User avatar
odklizec
Ranorex Guru
Ranorex Guru
Posts: 5071
Joined: Mon Aug 13, 2012 9:54 am
Location: Zilina, Slovakia

Re: Mass Testing Split Report

Post by odklizec » Wed Jun 26, 2019 7:55 am

Hi,

I'm afraid, there is no out-of-the-box solution of your problem. In my opinion, the best approach is to prepare multiple run configurations, where each one runs couple of test cases (e.g. 50). Then create a batch file where each line runs one run configuration (using /rc: parameter). Hope this helps?
Pavel Kudrys
Ranorex explorer at Descartes Systems

Please add these details to your questions:
  • Ranorex Snapshot. Learn how to create one >here<
  • Ranorex xPath of problematic element(s)
  • Ranorex version
  • OS version
  • HW configuration

User avatar
Stub
Posts: 266
Joined: Fri Jul 15, 2016 1:35 pm

Re: Mass Testing Split Report

Post by Stub » Wed Jun 26, 2019 9:53 am

Is there any mileage in splitting things up into multiple test suites? We've been using both run configurations and multiple test suites to spread things out here.