paralle test scenario
Posted: Wed Jan 11, 2017 11:59 am
I have a feature to test (in an android app ) which is to trigger an Alarm when user kept device idle for a certain time period (configurable in server).
is it possible to test this parallel to other tests ?
like I log in to a device and kept it idle and then continue on other tests in another device (and finish those tests),
after the configured duration I have to check weather that alarm has got triggered.
Ex :
1-log in to device ( Idele alarm trigger time is configured to 30 minutes)
2-execute other test flows in another device ( everything will complete in 20 minutes)
3-ranorex will wait another 10 minutes and verify the idle alarm
please give me a suggestions/options to overcome this scenario ?
is it possible to test this parallel to other tests ?
like I log in to a device and kept it idle and then continue on other tests in another device (and finish those tests),
after the configured duration I have to check weather that alarm has got triggered.
Ex :
1-log in to device ( Idele alarm trigger time is configured to 30 minutes)
2-execute other test flows in another device ( everything will complete in 20 minutes)
3-ranorex will wait another 10 minutes and verify the idle alarm
please give me a suggestions/options to overcome this scenario ?