control progress bar in test run dialogbox
Posted: Mon Sep 10, 2012 1:59 pm
Hi,
Is it possible to control the progress bar in the test run dialog box? (see screenshot). With control I mean initiate the progress bar, update the progress, remove it.
What I'd like to do is this:
I wrote my own routine that waits for an application to cease existing, using the process ID of the application. I do so in a loop with a long timeout (I'm willing to wait quite long, i.e 80 seconds) I now would like to indicate in the progress bar how much of the timeout has already elapsed.
Christoph
Is it possible to control the progress bar in the test run dialog box? (see screenshot). With control I mean initiate the progress bar, update the progress, remove it.
What I'd like to do is this:
I wrote my own routine that waits for an application to cease existing, using the process ID of the application. I do so in a loop with a long timeout (I'm willing to wait quite long, i.e 80 seconds) I now would like to indicate in the progress bar how much of the timeout has already elapsed.
Christoph